Delivery & shipping
Delivery point, protective packing, transport responsibilities and shipping scope are agreed during quotation. For international projects, transport and import responsibilities are defined separately. Lead time is project-specific; shipping is included only where expressly quoted.
Acceptance & pre-shipment checks
A check plan can be prepared using the agreed product and container samples. Output target, fill variation, test duration, sample count and recording method are selected for the application. Remote video review or on-site acceptance may be included in the project scope.
Installation & commissioning
Power, compressed air, product supply, workspace and line interfaces are clarified before delivery. On-site installation, commissioning and operator training are specified together with site conditions, duration and travel costs.
Spare parts & maintenance
A spare-parts list can cover wear parts, replaceable wetted components and production-critical items. Supply, recommended stock, maintenance intervals and service terms depend on the equipment configuration. Spare parts may be quoted separately.
Remote & on-site support
An initial assessment can use fault descriptions, alarm records and safely obtained photos or videos. Connectivity, software scope, intervention method and on-site service are agreed separately. Response times are defined by the service arrangement.
Warranty & documentation
Standard QDM machine warranty is one year from commissioning, within the contractual scope. Purchased components follow the relevant manufacturer’s terms. Operating, maintenance, drawing and conformity documentation is defined for the particular equipment.