Use the released configuration

Confirm components, material grades, drawings and relevant manufacturing instructions before repeating the build. Record any difference from the reviewed prototype. A supply-driven substitution can affect more than availability, so define who reviews its effect on interfaces, function and inspection before it is incorporated.

Review variation and assembly experience

Track important fit and assembly observations across the agreed units. Identify adjustment work, supplier issues and deviations that may need an engineering change. The purpose is to learn whether the selected manufacturing arrangement supports the required result; a small build should not be described as proof of unrestricted production capacity.

Agree acceptance and delivery responsibilities

Identify the final checks, records and customer review method. Remote or on-site acceptance can be scoped, with overseas installation and commissioning where agreed. Packaging, transport interfaces and destination information belong in the quotation. Responsibilities and additional expenses should be explicit before the equipment is prepared for delivery.

Hand over the contracted information

Define operating information, maintenance arrangements, spare-parts scope and the drawings or records included in the contract. Extended warranty and maintenance can be agreed separately. QDM coordinates the contracted engineering and manufacturing package; revisions, drawing rights and later production orders remain project-specific commercial matters.

What to define for the project.

Pilot production, acceptance and project handover — discussion checklist
DecisionWhat to defineWhy it matters
BuildQuantity and released configurationDefines the pilot package
ChangesReviewed supplier or design deviationsProtects the accepted scope
ChecksUnit and assembly evidenceShows the supplied condition
DeliveryDestination and commissioning scopeAssigns responsibilities
HandoverDocuments, support and permitted useCompletes the agreed package

These notes support an initial engineering discussion. Material grades, manufacturing routes, dimensions and acceptance criteria are selected for the actual application and confirmed in the project specification.